EXCELLENCE IN ENGINEERING, ARCHITECTURE & PLANNING SINCE 1974

Naples, Italy

Naples Metro Line

A complex underground extension bringing two of Naples’ major rail networks together beneath one of Italy’s most densely layered cities.

The project involved the final design of a 3.3 km heavy metro line capable of simultaneous operations by Alifana Railway trains and Naples Underground Line 1. The route combines cut-and-cover and bored tunnelling, with four underground stations — three built using cut-and-cover excavation between slurry walls, and one formed by widening an existing line tunnel.

Team Group delivered the complete final design package covering station finishes and auxiliary buildings, electrical substation, permanent way, all operating systems including signalling, automation, fire prevention and safety, and full coordination of design and construction phases.

Services Provided

  • Final design of station finishes and line auxiliary buildings
  • Electrical substation structure and finishing
  • Permanent way design
  • Operating systems: signalling, automation, supervision, safety and data transmission
  • Station installations: ventilation, mechanical, electrical, fire prevention
  • Works programming and construction site coordination
  • Bills of quantities assistance
  • External works design
  • Design and construction coordination