EXCELLENCE IN ENGINEERING, ARCHITECTURE & PLANNING SINCE 1974

Malawi

Mchinji – Nkaya Railway Line – Feasibility Study

A comprehensive feasibility study for rehabilitating Malawi’s central railway corridor — unlocking a key link in the cross-border route connecting Zambia to the Indian Ocean.

The Mchinji–Nkaya line runs 411 km across central Malawi, forming a critical east-west railway corridor that connects the Chipata–Malawi border crossing to the country’s main rail network. Its rehabilitation is part of a broader regional connectivity strategy linking Zambia to the ports of Nacala and Beira via the Malawi network.

Team Group conducted the full feasibility study in two phases. The inception phase covered revision of existing technical, economic and environmental documentation, assessment of current and future operational requirements, determination of infrastructure design criteria and a work methodology plan. The main feasibility phase delivered traffic forecast scenarios and revenue estimates, infrastructure assessment and cost estimates for rehabilitation and upgrading works, environmental screening, cost-benefit analysis to identify the optimal investment solution, a poverty impact analysis, and a climate change impact assessment.

Services Provided

  • Revision of existing technical, economic & environmental documentation
  • Assessment of current & future operational requirements
  • Infrastructure design criteria & standards determination
  • Traffic forecast scenarios & revenue estimates
  • Infrastructure assessment & cost estimates for rehabilitation works
  • Environmental screening & project brief
  • Cost-benefit analysis & optimal investment solution identification
  • Poverty impact analysis
  • Climate change impact assessment

© 2026 Team Group | All rights reserved | VAT No: 01156681007 | Fiscal Code: 03078740580