EXCELLENCE IN ENGINEERING, ARCHITECTURE & PLANNING SINCE 1974

Baghdad, Iraq

Cable-Stayed Bridge over the Tigris River

A landmark crossing over the Tigris — designed to bridge not just a river, but the history of a city.

Commissioned by Iraq’s Ministry of Construction and Housing through the State Commission for Roads and Bridges, Team Group developed an alternative preliminary design for a cable-stayed bridge spanning the Tigris River in north-east Baghdad.

The proposed design features a single central pylon with two legs connected by three transverse elements — shaped to evoke a historic gateway across the river. With two equal spans of 285 metres each, the structure minimises interference with both river shores while achieving a dramatic presence on the Baghdad skyline. The deck employs a steel-concrete composite structure.

 

Services Provided

  • Alternative preliminary design for tender
  • Cable-stayed bridge structural concept and design
  • Single central pylon design with dual 285 m spans
  • Steel-concrete composite deck design

© 2026 Team Group | All rights reserved | VAT No: 01156681007 | Fiscal Code: 03078740580