EXCELLENCE IN ENGINEERING, ARCHITECTURE & PLANNING SINCE 1974

Nigeria

Lagos–Ibadan Railway Modernisation

A flagship chapter in Nigeria’s national railway transformation, connecting Lagos to Ibadan at 200 km/h.

The Lagos–Ibadan section is the second phase of Nigeria’s Railway Modernization Project — a new standard gauge line stretching 1,315 km from Lagos to Kano, with connections to Abuja via Minna and Kaduna. The 157 km double-track line serves ten stations and is designed for mixed passenger and freight operations at speeds up to 200 km/h.

Team Group provided technical study and supervision services throughout all design phases, including alignment verification, cross-checking of Chinese specifications against international standards, signalling and telecommunications design, works supervision, and assistance with final testing, commissioning and maintenance procedures.

Services Provided

  • Pre/contract technical, economic and contractual assistance
  • Design vetting: alignment, technical parameters and standards
  • Verification of Chinese specifications against international standards
  • Signalling and telecommunications design
  • Works supervision
  • Assistance with final testing and commissioning
  • Review and approval of Maintenance Manuals and procedures

© 2026 Team Group | All rights reserved | VAT No: 01156681007 | Fiscal Code: 03078740580