Patani Bridge – Nigeria

Patani BridgeLOCATIONNigeriaCLIENTSETRACO Nigeria LtdPROJECT DATE4/2011 – 12/2014DESCRIPTION Construction engineering and technical assistance to the Construction Contractor, during all the erection stages of this long span bridge, length of 849m and main spans of 95m. The technical assistance includes modification of permanent design details to suit the preferred erection method, design of temporary special systems, geometric…

Volta Bridge – Ghana

Volta BridgeLOCATIONGhanaCLIENTGhana Railway Development AuthorityPROJECT DATE01/2017 – OngoingDESCRIPTION Railway bridge, that crosses the Volta River, located half way between the Akosombo and the Akuse dams in Ghana. The bridge has five spans of 60m for a total length of 300m; the deck is made up of two steel girders and a top slab in reinforced…

Lagos-Ibadan Railway Modernization – Nigeria

Nigerian Railway Modernization LAGOS – IBADANLOCATIONNigeriaCLIENTFederal Ministry Of TransportCONTRACTORCCECC – China Civil Engineering Construction CorporationPROJECT DATE4/2017 – OngoingDESCRIPTIONThe Lagos-Ibadan railway is part of the Nigerian Railway Modernization Project, consisting in the realization of a new standard gauge railway line from Lagos to Kano with connections to Abuja, via Minna and Kaduna, total length 1315 km.…

Suspension Bridge in Baghdad – Iraq

Suspension Bridge in BaghdadLOCATIONBaghdad, IraqCLIENTThe Government of the Republic of Iraq/Ministry of Construction and Housing (MoCH) State Commission for Roads & Bridges (SCRB)PROJECT DATE02/2013 – 03/2013 DESCRIPTIONThe main characteristics of the proposed cable-stayed bridge design option: Single central pylon, with very low interference with the river shores, and two spans of 285.0m each; The central…

Zhengzhou-Fuyang Railway Project Supervision Zfjl – 2 Section

Zhengzhou-Fuyang Railway Project Supervision Zfjl – 2 SectionLOCATIONPeople’s Republic of ChinaCLIENTBeijng-Fuzhou Railway Passenger Dedicated Line Anhui Co., LtdPROJECT DATE08/2016 – 04/2018DESCRIPTION Supervision of Lot ZFJL-2 (Anhui Section) of the Zhengzhou-Zhoukou-Fuyang High Speed Railway Line. The section has double ballast-less tracks includes one station, 31 Km of precast girders viaduct, 2 precast sections for in situ…

Railway Spurs: Livingstone – Kazungula – Sesheke & Nseluka-Mpulungu

Railway Spurs: Livingstone – Kazungula – Sesheke & Nseluka-MpulunguLOCATIONZambiaCLIENTMinistry of Transport, Works, Supply and CommunicationPROJECT DATE13/10/2015 – 30/12/2016DESCRIPTION The project consists of the Design of two Railway Spurs (narrow gauge, 1,067m) with the aim of: Connecting the future Kazungula Bridge to the ZRL network with a corridor that starts from Livingstone and reaches Namibia through…

Chipata to Mchinji Railway Line- Zambia/Malawi

Chipata to Mchinji Railway LineLOCATIONZambiaCLIENTMinistry of Transport, Works, Supply and CommunicationsPROJECT DATE05/2016 – ongoingDESCRIPTION The railway connects the TAZARA line in the west with the railway from Chipata (Zambia) to Mchinji (Malawi) in the east. With a gauge of 1067mm, it is 400 km long and is part of the railway system that connects the…

Utonde River Bridge – Eq. Guinea

Utonde River BridgeLOCATIONRepublic of Equatorial GuineaCLIENTMinistry of Infrastructure and Urbanization National Design DepartmentPROJECT DATE12/2006 – 10/2008DESCRIPTION The road bridge will cross the River Utonde in the proximity of the town of Utonde and will connect the expanding area north of Bata with the airport. The deck of the bridge is in pre-stressed, reinforced concrete with…

Railway Line Feasibility Study – Cameroun

LOT 1 – Feasibility Study Railway Line EDÉA – KRIBI – LOLABÉLOCATIONCamerounCLIENTMinistry of Public WorksPROJECT DATE6/2017 – 10/2021DESCRIPTIONFeasibility Study of the rail route (136 km) with the following characteristics: Double track line; standard gauge 1.435 m; Axle load : Infrastructure : 22.5 tons and structure: 25 tons; Traction: diesel with potential for future electrification; Design…